Services

Floor Preparation & Removal

Nothing you install will be better than the surface underneath it. Preparation is the least visible part of the job and the part that decides the result.

Floor Preparation & Removal

We remove old flooring and adhesive residue, level and screed where the floor is out of true, and leave a clean, flat, dry base ready for tiles, wood, laminate or vinyl. This work can also be quoted on its own if another contractor is installing the finish.

Levelling, screeding and the removal of old flooring so the new surface sits flat and stays flat.

Preparation work we carry out

  • Floor Preparation
  • Floor Levelling
  • Old Flooring Removal
  • Skirting Board Installation

3030-175 Coimbra · +351 912 522 925

How we work

How we approach the work

Every job follows the same sequence, whether it is a single room or a full commercial floor.

  1. 01

    Contact Us

    Send a message by WhatsApp, email or the quote form with a short description of your project.

  2. 02

    Discuss Your Project

    We talk through the space, the surfaces, the materials and the timing that suits you.

  3. 03

    Receive a Quotation

    You get a clear quotation covering the agreed scope of work.

  4. 04

    Project Completion

    We complete the work as agreed, leave the space clean and confirm you are satisfied.

Common questions

Can you do preparation only?
Yes. If another contractor is laying the finish, we can quote for removal, levelling and preparation on its own.
How do I know if my floor needs levelling?
Visible dips, rocking furniture and gaps under a straight edge are the usual signs. We check with a level before quoting.
Do you dispose of the old flooring?
Yes, removal and disposal can be included. Tell us what is currently down so it is priced correctly.

Need a quotation for floor preparation & removal?

Send us the room sizes, surfaces and timing you have in mind and we will come back with a clear price.